Text Box:

 

 

 

THE SINGARENI COLLIERIES COMPANY LIMITED

(A Government Company)

  Singareni Bhavan, P.B.No. 18, Red Hills, Khairatabad P.O.,

Hyderabad –500 004

Phone Nos. : 23393706/23316171/23397775: Fax – 040-23307653

 

                                                                                                                        Dt:  7-1-2012

 

PRICE NOTIFICATION NO. 32/2011-12

 

            As per the Gazette Notification No. 22021/1/2008-CRC-II, DT. 30.12.2011     issued by Government Of India to switch over from UHV based gradation system to GCV based system and in  pursuance of the Colliery Control Order 2000, issued by the Govt. of India on 1st January 2000 in supersession of our earlier PRICE NOTIFICATION NO. 31/2011-12, dt. 01.08.2011, following are the revised Grade- wise GCV based  Basic prices of Run of Mine (ROM) coal of the Singareni Collieries Company Limited, excluding statutory levies w.e.f. “00.00” hours of 08.01.2012.

 I.

Grade of Coal

Gross Calorific Value per Kilo Calories / per Kilogram

ROM Coal

(in Rs.)

G1

Above 7000

3542

G2

6701 to 7000

3393

G3

6401 to 6700

3244

G4

6101 to 6400

3032

G5

5801 to 6100

2886

G6

5501 to 5800

2360

G7

5201 to 5500

1840

G8

4901 to 5200

1700

G9

4601 to 4900

1500

G10

4301 to 4600

1400

G11

4001 to 4300

1130

G12

3701 to 4000

910

G13

3401 to 3700

690

G14

3101 to 3400

610

G15

2801 to 3100

510

G16

2501 to 2800

474

G17

2201 to 2500

420

 

 

 

 

 

II.                Basic prices of Washery Grade coal per tonne:

 

Washery Grade   G9              =   Rs.2778

                      Washery Grade  G11  =   Rs.1690

Washery Grade  G13            =   Rs.1490

Washery Slurry                      =   Rs.  427

Washery Rejects                   =   Rs.  480

 

III.               The basic price of ‘G 15” crushed coal of JK-5 OCP project (cost plus) is  notified as  Rs.845.69.

IV.  Notes:

 

1.                  Run of Mine coal is coal comprising of all sizes which comes out of the mine without any crushing or screening.

 

2.                  The fraction of the Run of Mine coal as is retained on a screen when subjected to screening OR is picked out by fork shovel during loading is called Steam coal.

 

3.                  The fraction that remains after Steam Coal has been removed from the Run of Mine coal is called Slack coal.

 

4.                  When the top size is limited to any maximum limit within the range of 200 – 250 mm through manual facilities or mechanical facilities is called Crushed ROM Coal.

 

5.                  Additional Rs.20/- shall be charged on pithead price of Run of Mine coal for the supply of Slack coal.

 

6.                  Additional of Rs.220/- shall be charged on pithead price of Run of Mine Coal for the supply of Steam Coal.

 

7.                  Where the top size is being limited to any maximum limit within the range of 200 mm – 250 mm through manual facilities of mechanical means, a charge at the rate of Rs.60/- per tonne will be levied in addition to the price applicable for Run of Mine coal.

 

8.                  Additional crushing charges of Rs.6/- per tonne for (-) 100 mm size coal will be levied which would be over and above the existing grade crushing charges for (-) 200 mm size.

 

9.                  When coal is loaded either into Indian Railway Services OR into the Purchaser’s own system of transport through high capacity loading system with a nominal capacity of 3500 Tonnes per hour or more, additional charges of Rs.20/- per tonne will be levied  for such loading w.e.f. 30.3.2010.

 

10.   Where coal is transported from pithead to the loading points additional transport costs, will be collected extra from the purchasers at the following rates.

 

DISTANCE

STC RATE

0 – 3 Kms

Rs.17/- per tonne

Distance more than 3 Kms, but not more than 10 Kms

Rs.44/- per tonne

Distance more than 10 Kms, but not more than 20 Kms

Rs.77/- per tonne

Distance more than 20 Kms

Actual Transport charges including the expenditure incurred towards repair & maintenance of roads leading to SCCL loading points subject to a minimum of Rs.77 per tone.

 

Mode of transport like Conveyor, Aerial, Ropeway etc., are included for levy of Surface Transport Charges.

 

11.       The Pit-head prices fixed are exclusive of Royalty, cess, taxes and levy, if any, levied by the Govt., Local authorities or other Bodies, duties of excise and Sales Tax from time to time.         

 

12.       For undertaking special sizing or benefication of coal, additional charges as may be negotiated between the Purchaser and SCCL will be realized over and above the notified prices.

 

13.       Premium prices applicable to the concerned dispatch points and other charges like royalty, forest land adjustment cost, Fuel Surcharge, Clean Energy Cess, pre-weigh-bin charges, stowing excise duty are chargeable over and above the notified price.

 

14.              Forest Land adjustment cost and forest permit fee will be levied at Rs.27/- per tonne for all grades of coal including un-graded coal w.e.f. 30.7.2011.

 

15.       Pre-weigh bin charges at Rs.25/- per tonne will be levied at all Road & Rail dispatch points where coal is delivered through pre-weigh bins.

 

16.    Shunting charges @ Rs.15/- per tonne will be levied for the customers for whom coal is being despatched through Rail mode w.e.f. ‘00-00’ hours of 30.7.2011.

 

17.       SCCL will charge Rs.692.70 extra per tonne over and above the notified price from 1.4.2011 in respect of the coal produced from OC-II mine of Ramagundam.

 

18.       Fuel Surcharge will be levied at Rs.48/- per tonne w.e.f. ‘00-00’ hours of            25.6.2011.

 

19.     Clean Energy Cess will be levied at Rs.50/- per tonne w.e.f. ‘00-00’ hours of 1.7.2010 as per the Govt. of India, Ministry of Finance Notification Nos.01/2010 to 06/2010.

 

 

 

 

                        Chief General Manager

                                                                                   (Marketing)